Hot Water Supply Company: Dalian Thermal Power Plant
Location: Dalian City Liaoning Province
Construction Time: July-Oct. 2015
Hot Water Supply Area: 250000㎡
Designed Temp.: 70℃
Designed Operation Pressure: 0.5-0.8Mpa
Installation Length: 80000m
This project is for old building hot water piping replacement installation. All installation were direct buried installation. The whole project adopts PERT II pipes from dn63mm to dn225mm.