Hot Water Supply Company: Jilin Hot Water Supply Group
Location: Jilin City Jilin Province
Construction Time: June-Oct. 2015
Hot Water Supply Area: 450000㎡
Designed Temp.: 70℃
Designed Operation Pressure: 0.4-0.8Mpa
Installation Length: 16000m
This project is for old building hot water piping replacement installation. The whole project adopts PERT II pipes from dn63mm to dn225mm.