Hot Water Supply Company: Haerbin Property Hot Water Supply Group
Location: Petrochemical Residence Building Haerbin Heilongjiang Province
Construction Time: Sept. 2014
Hot Water Supply Area: 30000㎡
Designed Temp.: 70℃
Designed Operation Pressure: 0.8Mpa
Installation Length: 1000m
This project is for old building hot water piping system upgrading, the original steep pipe only performed about 5 years, there are several leak points, the original dn 125mm steel piping system were replaced by PERT II dn160mm pipe system.