Hot Water Supply Company: Mudanjiang Thermal Power Plant
Location: Petrochemical Residence Building Mudanjiang Heilongjiang Province
Construction Time: Oct. 2014
Hot Water Supply Area: 6000㎡
Designed Temp.: 70℃
Designed Operation Pressure: 0.4Mpa
Installation Length: 30m
This project is for urgent repair of the old building hot water piping system, the original steep pipe located inside the building of the dicth, during the trial hot water supply in 2014, there was sudden leak. The urgent repair adpot PERT II pipe and fittings from dn 90mm to 125mm.
Confined by the narrow installation space, flange connection and electrofusion connection were adopted.